Case study: Re-building of the Bisagno cover, Genoa

Location of the case study

Genoa, IT

Description of the application

The Bisagno Basin Plan identifies a number of hydraulic structures and maintenance works to be performed to reduce flood of the city centre. One of these is the Complete re-building of the Bisagno cover in its final reach. This work will not provide full safety against the discharge with a return period of two hundred years. This work costs EUR 94000000 and will end in 2016.

Related Links

Implementation costs (Show all)

>1.000.000 €

Stakeholders (Show all)

Residents



Served purpose of implementation (Show all)

Mildly Positive

Responsible authority levels (Show all)

Regional


Countries (Show all)

Italy

Application types (Show all)

Real Case Study

Resilience measures (Show all)

Floodplain excavation