Location of the case study
Les Boucholeurs, FRDescription of the application
This action is to implement maintenance procedures for works of drainage system of rainwater to soak maintain maximum capacity in the event of overflows related to the seas. Siltation looks, drains and pipes lying in close to the beach and especially the marine boulevard was found.Related Links
Last modified: Sept. 13, 2016, 3:14 a.m.