Case study: Management of water level of swamps, Les Boucholeurs

Location of the case study

Les Boucholeurs, FR

Description of the application

The objective will be to anticipate the alert ensuring the "drain" of some marshes in order to improve the storage capacity to accommodate the water from coastal flooding and possibly manage a large rainfall event. At the exit of the crisis, the hydraulic operation of the marshes will be optimized to improve time of draining. A study will help define for various crisis scenarios marsh management protocol and will be applied by the trade associations of marsh.

Related Links

Implementation costs (Show all)

100.000-1.000.000 €


Served purpose of implementation (Show all)

Strongly Positive

Responsible authority levels (Show all)

Other

Countries (Show all)

France

Application types (Show all)

Real Case Study