Location of the case study
Les Boucholeurs, FRDescription of the application
proposed work are defined in strengthening and development for trading on protection of existing structures and the construction of a dike belt on northern and eastern parts Previously, the work will be the subject of a hydraulic study to determine the timing dimensions of structures in relation to the reference event (Xynthia +) and water levels can be achieved in the hydraulic locker determined by new development (see action sheet VII-4-3). The work should take into account the developments planned in the framework of the optimization of the hydraulic ressuyage Port Punay channel.Related Links
Last modified: Sept. 13, 2016, 3:32 a.m.