Case study: Dike, Les Boucholeurs

Location of the case study

Les Boucholeurs, FR

Description of the application

proposed work are defined in strengthening and development for trading on protection of existing structures and the construction of a dike belt on northern and eastern parts Previously, the work will be the subject of a hydraulic study to determine the timing dimensions of structures in relation to the reference event (Xynthia +) and water levels can be achieved in the hydraulic locker determined by new development (see action sheet VII-4-3). The work should take into account the developments planned in the framework of the optimization of the hydraulic ressuyage Port Punay channel.

Related Links

Implementation costs (Show all)

>1.000.000 €


Served purpose of implementation (Show all)

Strongly Positive

Responsible authority levels (Show all)

Local

Countries (Show all)

France

Application types (Show all)

Real Case Study

Resilience measures (Show all)

Dike