Location of the case study
South-East England, GBDescription of the application
In South-East England, seven large-scale water storage facilities are being considered to increase storage capacity by 2020 for a total cost of approx. 3,5 B₤. However, the increase in reservoir capacity is also accompanied by demand-side measures aiming at reducing demand.Related Links
Sources (Show all)
[Strosser P., Roussard J., Grandmougin B., Kossida M., Berbel J., Kolberg S., Rodríguez-Díaz J.A., Montesinos P., Joyce J., Dworak T., Berglund M., and Laaser C., 2007]Last modified: Sept. 13, 2016, 4:56 a.m.