Case study: Fairway adjustment, Elbe river, Schleswig- Holstein, Lower Saxony(20th c.)

Location of the case study

Schleswig- Holstein, Hamburg, Lower Saxony, DE

Description of the application

Fairway adjustment of the tidal Elbe to 14.5m under MTnw with time. Deepening of the Elbe as consequence of the rising port operations.

Related Links

Implementation costs (Show all)

>1.000.000 €


Served purpose of implementation (Show all)

Strongly Positive

Responsible authority levels (Show all)

National - Government

Countries (Show all)

Germany

Application types (Show all)

Real Case Study

Resilience measures (Show all)

Adjustment of fairway


Last modified: Sept. 12, 2016, 8:54 a.m.