Case study: Redesigned flood protection system, Hamburg Port (20th c.)

Location of the case study

Hamburg, Port, DE

Description of the application

Street level of the Hafenrandstraße is 3m under the flood protection level.

Related Links

Implementation costs (Show all)

>1.000.000 €


Served purpose of implementation (Show all)

Strongly Positive

Responsible authority levels (Show all)

National - Government

Countries (Show all)

Germany

Application types (Show all)

Real Case Study

Resilience measures (Show all)

Flood hazard mapping


Last modified: Sept. 13, 2016, 4:06 a.m.