Case study: Redesign of flood protection system, Hamburg (21st c.)

Location of the case study

Hamburg, DE

Description of the application

Initialization of new construction program for flood protection. As a consequence of the storm surge of 1976 the complete flood protection line is to be increased by about a meter.

Related Links

Implementation costs (Show all)

>1.000.000 €


Served purpose of implementation (Show all)

Strongly Positive

Responsible authority levels (Show all)

National - Government

Countries (Show all)

Germany

Application types (Show all)

Real Case Study

Resilience measures (Show all)

Dike


Last modified: Sept. 12, 2016, 9:47 a.m.