Case study: Dike reinforcement, Land Hadeln, Lower Saxony, (20th c.)

Location of the case study

Land Hadeln, Lower Saxony, DE

Description of the application

Increase of the dike height. Due to the storm surge of 1976 a higher design water level was determined. The dikes need to be raised.

Related Links

Implementation costs (Show all)

>1.000.000 €


Served purpose of implementation (Show all)

Strongly Positive

Responsible authority levels (Show all)

National - Government

Countries (Show all)

Germany

Application types (Show all)

Real Case Study

Resilience measures (Show all)

Dike reinforcement


Last modified: Sept. 12, 2016, 9:43 a.m.